Refurbishment work at Terminal 2

March 19th, 2009

Refurbishment work on Terminal 2 at Dubai International Airport is now complete.

The airport’s smallest terminal now includes:

• A new façade and wider drop-off area
• An increase in the number of check-in counters from 22 to 36
• Dubai Duty Free – 1400 sq metre store in Departures, and 50 sq metre store in Arrivals
• Restaurants – McDonalds’s, Baskin Robbins, Costa Coffee etc.
• Shuttle bus service to Terminal 1 (20 minutes) and Terminal 3 (30 minutes)

Tags: ,

Leave a Reply

Jumeirah Beach Hotel

Jumeirah Beach Hotel